ThermalboardTM to a subfloor. In absence of a groove alignment tool, cut short (6") pieces of PEX pipe.
These can be used to align the grooves of the boards during installation by snapping them into the
Recommended optional items:
background image
ThermalboardTM Installation And Installation Manual 3/3/03 Page 9
tent of the subfloor to be sure it is in the 6 ­ 10% range. Check for excessive moisture in the crawl
accurate in the installation. If you are installing large areas of ThermalboardTM you may wish to invest
and return bury points.
Creaking subfloors must be repaired before installation. If the subfloor sags, inspect the joists below
rial as well as a compatible mastic for engineered wood products and appropriate rollers and
SUBFLOOR REQUIREMENTS, WOOD SUBFLOORS:
the manufacturer's recommendations, and allow the compound to dry completely before starting to
High areas are sanded or planed, low areas patched or filled with an appropriate leveling com-
grooves with 3" in the groove on each board. Once the board is secured they may be removed prior to the
·Square
ThermalboardTM cuts easily with a quality circular saw blade. Pieces frequently must be cut to provide
trowels
Wood subfloors must have a stable moisture content between 6 ­ 10%.
an accurate fit for each room. It is important that they be cut squarely to keep the alignment of grooves
Installers note:
for twists or weakness. If the subfloor is cupped or uneven at the joints, recheck the moisture con-
in a stand up drill so that you do not have to bend over to set every screw when glueing and screwing
See specific details that follow in the application section of this manual.
The following is necessary for the installation of Thermalboard:
SUBFLOOR REQUIREMENTS, CONCRETE SUBFLOORS:
·Table or circular saw. A carbide blade is recommended.
·Electric or cordless drill gun with No. 2 Phillips bit and 5/8" drill bit for supply
·Stand up drill
·Groove alignment tool
·If installing over concrete you may need insulation and waterproofing sealant membrane mate-
·Rubber or hard hide mallet
·Chalk line
space or basement and look for other signs of a potential water problem.
install the floor.
installation of the pipe
EQUIPMENT REQUIRED FOR INSTALLATION:
pound, or covered with a rigid underlayment. When using a leveling compound, be sure to follow
<< < [Pag.9] > >>

Esta version es la html del arhivo pdf ThermalBoard_inst-app_manual, genearada por domotica.name desde www.warmzone.com

Archivos relacionados:BlueHeat-Ins ComfortTileM DMC-IOM-Orig ECO-heater-b ETI-GIT-3A ETI-GIT-4 ETI-LCG-1 ETI-LCG ETI-LCR Floorizwarm_ GXmanual_Jan LXCableInsta LXDatasheet NAGX-Ins-A-O OJ-ThermUser OJnon-progra RetroHeat-In System_Appli Tile-Heat-Th february08_w march_newsle quicknet_spe quickstat_io roofheatinst tile-heating actuadores activethermal airwaysystem automatedceilingregisters coolcomponents easywarmfloor heatizon numinus pcslighting relampit taiserver temperatureguard touchplate warmzone