Lethal voltages are now present withing the control enclosure. The ammeter should read the nominal
800.234.4239 (USA and Canada) or 574.233.1202 (elsewhere)
wires with a wire nut.
products contact the Customer Service Department between 8:00am and 5:00pm EST (UTC minus five hours) at:
The GIT3A does not require user intervention during normal operation.
wires with a wire nut.
Post Installation Tests
tests and visual inspections identify these problems.
7. Apply power to the snow and ice melting system. This may require two points of connection. Use care.
operation. The gutter and downspout must be dry while doing these tests.
disconnect.
3. Locate the probe connections in the low voltage compartment. Remove the wire nuts from the black leads
two white wires don't touch electrically.
6. Using a wire nut, temporarily connect the two black and two white wires together.
and white leads. Make certain the same color wires remain twisted together and that the two black and
8. Immediately remove power from the snow and ice melting system. There may be two points of
Fax:
Although the GIT3A does not require routine maintenance, make certain that the gutters and down spouts are
cleaned each fall to ensure efficient gutter and down spout snow and ice melting system efficiency.
9. Make certain that the two black probe leads are securely connected together electrically. Secure these
For technical help, questions or comments concerning this product or any of Environmental Technology, Inc.
neither portable nor commonly available.
heater current.
Checking the sensor in the field is not practical. Verifying its operation requires special test equipment that is
2. Clamp the ammeter to one of the yellow leads in the control housing.
majority of problems. Frequently encountered problems include wiring errors and improper waterproofing. Simple electrical
Maintenance
Operating Instructions
zero amps.
10. Make certain that the two white probe leads are securely connected together electrically. Secure these
1. Remove power from the snow and ice melting system. There may be two points of disconnect.
Voice:
5. Remove power from the snow and ice melting system. There may be two points of disconnect.
Thoroughly check the system before placing it in service. Our experience shows that installation errors cause the
4. Apply power to the snow and ice melting system. This may require two points of connection. Use care.
888.234.4238 (USA and Canada) or 574.233.2152 (elsewhere)
E-mail:
Lethal voltages are now present withing the control enclosure. The ammeter should read approximately
helpdesk@networketi.com
Checking the operation of the control requires a clamp-on AC ammeter. Follow the steps below to verify
<< < [Pag.8]
Esta version es la html del arhivo pdf ETI-GIT-3A, genearada por domotica.name desde www.warmzone.com
Archivos relacionados:BlueHeat-Ins ComfortTileM DMC-IOM-Orig ECO-heater-b ETI-GIT-4 ETI-LCG-1 ETI-LCG ETI-LCR Floorizwarm_ GXmanual_Jan LXCableInsta LXDatasheet NAGX-Ins-A-O OJ-ThermUser OJnon-progra RetroHeat-In System_Appli ThermalBoard Tile-Heat-Th february08_w march_newsle quicknet_spe quickstat_io roofheatinst tile-heating actuadores activethermal airwaysystem automatedceilingregisters coolcomponents easywarmfloor heatizon numinus pcslighting relampit taiserver temperatureguard touchplate warmzone